Introduction:
Sequence RCDC air cooled automobile cleaning belt electromagnetic iron separator is added with a driving motor, two drums, an iron-cleansing belt on the basis of collection RCDA, also using an air blower for air cooling. This equipment is normally suspended above the conveyor belt, vibrating feeder or chute to accumulate magnetic aspects specially ferrous aspects from non-magnetic materials and clean the magnetic elements routinely. This item has a strong magnetic intensity and a long service daily life. It is dust proof, waterproof, quick radiating, car cleaning and corrosion-resistant.
Electromagnetic separators are widely used in the fields these kinds of as electrical power station, mines, metallurgy plants, construction resources, foodstuff, etc. They have a lot of positive aspects, this sort of as low temperature rise, good insulation, sturdy magnetic drive, lower power use and trustworthy efficiency.
Characteristics:
— Strong magnetic depth and unique design and style for magnetic circuit.
— The sealed composition makes the separator h2o-proof, dust-proof and corrosion resisting.
— Low power usage.
— Easy to install and handy to use.
— High performance and steady efficiency.
All round Dimension Drawing:
CZPT Parameters
NO. | Design | conveyor belt width (mm) |
Suspension peak (h=mm) |
Material depth (≤mm) |
Magnetic intensity (≥mt) |
Current power (≤kw) |
Belt speed (m/s) |
Driving Energy (kw) |
Excess weight (kg) |
Appearance size (mm) |
|||||
A | B | C | D | E | |||||||||||
1 | RCDC-5 | five hundred | one hundred fifty | one hundred | sixty | one.two | four.five | 1.5 | 1080 | 1900 | 965 | 720 | 750 | 1030 | |
2 | RCDC-6 | 600 | 175 | a hundred and twenty | sixty | two.5 | 1.5 | 1350 | 2050 | 1170 | 810 | 800 | 1150 | ||
three | RCDC-six.5 | 650 | two hundred | a hundred and fifty | 70 | 3. | one.5 | 1530 | 2165 | 1370 | 820 | 888 | 1233 | ||
four | RCDC-eight | 800 | 250 | two hundred | 70 | six. | two.two | 2100 | 2350 | 1420 | 860 | 1031 | 1300 | ||
five | RCDC-ten | a thousand | 300 | 250 | 70 | 8. | 3. | 3380 | 2660 | 1700 | 880 | 1231 | 1500 | ||
6 | RCDC-twelve | 1200 | 350 | three hundred | 70 | eleven. | four. | 4150 | 2860 | 1850 | 950 | 1505 | 1700 | ||
7 | RCDC-14 | 1400 | 400 | 350 | 70 | fourteen. | five.five | 5500 | 3225 | 2070 | 1571 | 1674 | 1950 | ||
eight | RCDC-sixteen | 1600 | 450 | four hundred | 70 | 16. | 7.5 | 6900 | 3600 | 2270 | 1050 | 1874 | 2400 | ||
nine | RCDC-18 | 1800 | 500 | 450 | 80 | twenty. | seven.five | 8800 | 4300 | 2570 | 1160 | 2100 | 2850 | ||
Be aware:All themodels have T1,T2,T3design whose magnetic intensity is higher than standard.The magnetic 90mt,120mt and 150mt separately, Discard iron belt can be equipped with armor. |
FAQ
Q: Are you a factory ?
A:Yes,we are factory, which was set up in 2006.
We focus on providing expert service such as layout, manufacture, set up & routine maintenance for the logistic industries & warehouse gear.
Q: Terms of Payment:
A:thirty% of the complete quantity by TT as deposit, the balance to be paid out by TT or L/C at sight just before the devices leaving seller’ factory.
100% irrevocable L/C at sight.
Q:Time for planning of products:
A:The earlier mentioned equipment shall be prepared for shipping and delivery during 45 days from the date of acquiring the deposit/LC, excluding the time of waiting for cargo. If there is any delay of shipping caused by vendor, 3‰ of the whole quantity shall be compensated to buyer each day, but this sum shall not exceed the quantity of deposit if the hold off is induced by buyer, 3‰ of the complete amount shall be compensated to vendor each day, but this amount shall not exceed 10% of overall worth of equipment.
Q:Guarantee period of time:
A:The promise period of time for the earlier mentioned devices is twelve months from the day of putting into use, but not exceeds twenty-4 months following the equipment leaving seller’s manufacturing facility. It is not relevant for quick dress in areas.
Q: Might I know the position of my buy?
A: Of course. We will ship you details and images at diverse manufacturing phase of your purchase. CZPTy stage will be send out to you in time.
Q: Can I customize shelving or racking at my very own size?
A: Confident.
Q: If i need the complete mineral processing line. is Baite able to assist us construct it?
A: Yes, we can support you mix a comprehensive mineral processing line. and give you relevant skilled tips as prolonged as you need.
There is a rich encounter engineer staff of us. we experienced previously construct several mining initiatives in China & Abroad. You can feel our high quality and support.
Why Pick us?
1.Pre-sale services: enthusiasm
We provide you with the prophase plan, process flow design and manufacturer equipment according to your special demand.
two.one particular-year warranty to make sure your machine runs consistently.
We always offering lifelong services and provide spare parts for a long term,and repair main parts under right using for free in two years.
three.CZPT services
3.1 Design and style of creation line and options according to buyer’s need.
three.2 In seven days soon after the receipt of deposit, the vendor shall provide associated technical files for products installation, in addition to these with special demands.
three.3 Ahead of supply, the vendor can modify the previous answers in accordance to buyer’s requirement.
four.After-sales support
4.one Throughout the set up and commissioning, the seller shall send out technician to the site for instruction of set up and commissioning, and for education of workers.
four.2 If there is any gear failure caused by the consumer, the vendor shall help the servicing of equipment and alternative of fittings, and expenses appropriate costs.
four.3 CZPT the ensure time period, the vendor can provide solutions and fittings at a most preferential value.
4.4The vendor can give consultation and inspection services freely for other merchandise, especially for the up-stream and down-stream items of our equipment.
Packgage& Shipping
Workshop Over View: